[{"data":1,"prerenderedAt":57},["ShallowReactive",2],{"$fLu5qWVTGQCWz9HUL2tGtk2rNh0CZSzcr1VuD44AyMzw":3},{"id":4,"siteId":5,"orgId":5,"channelId":6,"userId":7,"modifiedUserId":7,"created":8,"modified":9,"publishDate":10,"onlineDate":11,"sticky":12,"withImage":13,"inputType":12,"type":12,"status":12,"order":4,"site":14,"channel":17,"org":29,"user":33,"modifiedUser":35,"blockItemList":36,"tags":37,"destList":38,"views":39,"title":40,"text":41,"url":42,"description":43,"template":44,"normal":13,"link":45,"image":46,"alias":47,"ups":12,"downs":12,"downloads":12,"customs":48,"fileList":49,"seoKeywords":50,"seoDescription":43,"editorType":51,"targetBlank":45,"dynamicUrl":42,"comments":12,"articleTemplate":52,"imageList":53,"baiduPush":45,"favorites":12,"dayViews":12,"weekViews":12,"monthViews":12,"quarterViews":12,"yearViews":39,"plainText":54,"fileSize":55,"blocks":56,"editable":13,"allowComment":13},"91897349649423362","1","9","91663905825182209","2026-04-21T16:58:04+08:00","2026-04-23T09:43:41+08:00","2026-04-21T16:28:55+08:00","2026-04-21T16:00:00+08:00",0,true,{"id":5,"name":15,"url":16},"Auralink Energy CMS","https:\u002F\u002Fwww.auralink-energy.com\u002Fapi\u002F",{"id":6,"articleModelId":18,"name":19,"nav":13,"orderDesc":13,"url":20,"paths":21},"11","英文","https:\u002F\u002Fwww.auralink-energy.com\u002Fapi\u002F\u002Fchannel\u002Fnews_en",[22,27],{"id":23,"name":24,"alias":25,"nav":13,"url":26},"4","新闻","news","https:\u002F\u002Fwww.auralink-energy.com\u002Fapi\u002F\u002Fchannel\u002Fnews",{"id":6,"name":19,"alias":28,"nav":13,"url":20},"news_en",{"id":5,"name":30,"paths":31},"总部",[32],{"id":5,"name":30},{"id":7,"username":34},"wangdan",{"id":7,"username":34},[],[],[],"0","Auralink Energy and AMBER POWER Host Grana for Strategic Partnership Discussions","\u003Cp>On\u003Cspan style=\"font-family:&#39;candara&#39; , sans-serif\"> April 21, a delegation from Grana, Argentina&#39;s largest engineering services company, visited Auralink Energy and its partner AMBER POWER. This marked the second meeting between the two parties, following their initial meeting in December of the previous year. The discussions centered around regional agency representation and cooperation models for the new energy sector in Latin America.\u003C\u002Fspan>\u003C\u002Fp>\n\u003Cp>\u003Cspan style=\"font-family:&#39;candara&#39; , sans-serif\">\u003Cimg src=\"\u002Fuploads\u002F1\u002Fimage\u002F2026\u002F04\u002F20260421170834295_iipuzm45jaru.jpg\" \u002F>\u003C\u002Fspan>\u003C\u002Fp>\n\u003Cp>\u003Cspan style=\"font-family:&#39;candara&#39; , sans-serif\">Grana is one of the most influential providers of engineering and corporate image services in Latin America, with a global footprint. Its clients include major oil companies such as YPF, Shell, and Pan American Energy, with whom it has long-term, stable partnerships. With over 50 years of experience in project construction and installation, Grana is highly regarded for its expertise and reliability.\u003C\u002Fspan>\u003C\u002Fp>\n\u003Cp>\u003Cspan style=\"font-family:&#39;candara&#39; , sans-serif\">AMBER POWER, a rapidly growing provider of integrated solar-storage-charging solutions and new energy infrastructure from China, has established a global presence. With more than 100 patented technologies, AMBER POWER has quickly expanded its high-quality, safety-certified products into international markets, underpinned by extensive expertise in technology and quality.\u003C\u002Fspan>\u003C\u002Fp>\n\u003Cp>\u003Cspan style=\"font-family:&#39;candara&#39; , sans-serif\">\u003Cimg src=\"\u002Fuploads\u002F1\u002Fimage\u002F2026\u002F04\u002F20260421170854494_8bhkhvp3o9n0.jpg\" \u002F>\u003C\u002Fspan>\u003C\u002Fp>\n\u003Cp>\u003Cspan style=\"font-family:&#39;candara&#39; , sans-serif\">Grana’s CEO expressed the company’s intent to forge a deep strategic partnership with Auralink Energy and AMBER POWER, collaborating on channel resources and station construction in Argentina’s new energy sector.\u003C\u002Fspan>\u003C\u002Fp>\n\u003Cp>\u003Cspan style=\"font-family:&#39;candara&#39; , sans-serif\">AMBER POWER’s Chairman, Mr. Li, expressed confidence in the partnership and stated, “AMBER POWER has long been dedicated to technological innovation and deeply understanding customer needs. We offer tailored charging solutions for various global markets, including multi-language interfaces such as Spanish, Portuguese, and German. Our products meet both European and American standards, providing single and dual gun charging stations across various power ranges, alongside comprehensive product usage and installation training.”\u003C\u002Fspan>\u003C\u002Fp>\n\u003Cp>\u003Cspan style=\"font-family:&#39;candara&#39; , sans-serif\">The electric vehicle (EV) charging infrastructure market in Argentina is projected to reach USD 209.29 million by 2025, and grow to USD 1.504 billion by 2034. With the Argentine government’s recent removal of a 35% import tariff on electric vehicles, the market is poised for accelerated growth. The EV market in Argentina surged by 56% in the first half of 2025, demonstrating its tremendous potential.\u003C\u002Fspan>\u003C\u002Fp>\n\u003Cp>\u003Cspan style=\"font-family:&#39;candara&#39; , sans-serif\">Auralink Energy is accelerating its global expansion, having already established a stable partnership with China’s AMBER POWER. With the addition of new partner Grana from Argentina, the three companies will work together through methods such as sample demonstrations, regional representation, and technical training to jointly develop the new energy solar-storage-charging market in Argentina and Latin America, contributing to the global movement for low-carbon, green, and sustainable development.\u003C\u002Fspan>\u003C\u002Fp>","https:\u002F\u002Fwww.auralink-energy.com\u002Fapi\u002F\u002Farticle\u002FAuralink-Energy-and-AMBER-POWER-Host-Grana-for-Strategic-Partnership-Discussions","Auralink Energy, in partnership with AMBER POWER, hosted a delegation from Grana, Argentina's leading engineering services company, on April 21. The discussions centered on forging a strategic partnership in the Latin American new energy sector, focusing on regional representation and station construction. Grana, with over 50 years of expertise, aims to collaborate with Auralink Energy and AMBER POWER in expanding Argentina's electric vehicle (EV) charging infrastructure. AMBER POWER, known for its innovative solar-storage-charging solutions, is ready to introduce its safety-certified products to Argentina's rapidly growing EV market, expected to reach USD 1.5 billion by 2034. The partnership will support low-carbon, sustainable development in the region.","\u002F1\u002Fdefault\u002Farticle",false,"\u002Fuploads\u002F1\u002Fimage\u002F2026\u002F04\u002F20260421170816918_87l4gnxkqdbk.jpg","Auralink-Energy-and-AMBER-POWER-Host-Grana-for-Strategic-Partnership-Discussions",{},[],"AuralinkEnergy;AMBERPOWER;Grana;Strategic; solar-storage-charging;Argentina;Latin America;energyinfrastructure;",1,"article",[],"On April 21, a delegation from Grana, Argentina's largest engineering services company, visited Auralink Energy and its partner AMBER POWER. This marked the second meeting between the two parties, following their initial meeting in December of the previous year. The discussions centered around regional agency representation and cooperation models for the new energy sector in Latin America. Grana is one of the most influential providers of engineering and corporate image services in Latin America, with a global footprint. Its clients include major oil companies such as YPF, Shell, and Pan American Energy, with whom it has long-term, stable partnerships. With over 50 years of experience in project construction and installation, Grana is highly regarded for its expertise and reliability. AMBER POWER, a rapidly growing provider of integrated solar-storage-charging solutions and new energy infrastructure from China, has established a global presence. With more than 100 patented technologies, AMBER POWER has quickly expanded its high-quality, safety-certified products into international markets, underpinned by extensive expertise in technology and quality. Grana&rsquo;s CEO expressed the company&rsquo;s intent to forge a deep strategic partnership with Auralink Energy and AMBER POWER, collaborating on channel resources and station construction in Argentina&rsquo;s new energy sector. AMBER POWER&rsquo;s Chairman, Mr. Li, expressed confidence in the partnership and stated, &ldquo;AMBER POWER has long been dedicated to technological innovation and deeply understanding customer needs. We offer tailored charging solutions for various global markets, including multi-language interfaces such as Spanish, Portuguese, and German. Our products meet both European and American standards, providing single and dual gun charging stations across various power ranges, alongside comprehensive product usage and installation training.&rdquo; The electric vehicle (EV) charging infrastructure market in Argentina is projected to reach USD 209.29 million by 2025, and grow to USD 1.504 billion by 2034. With the Argentine government&rsquo;s recent removal of a 35% import tariff on electric vehicles, the market is poised for accelerated growth. The EV market in Argentina surged by 56% in the first half of 2025, demonstrating its tremendous potential. Auralink Energy is accelerating its global expansion, having already established a stable partnership with China&rsquo;s AMBER POWER. With the addition of new partner Grana from Argentina, the three companies will work together through methods such as sample demonstrations, regional representation, and technical training to jointly develop the new energy solar-storage-charging market in Argentina and Latin America, contributing to the global movement for low-carbon, green, and sustainable development.","0 KB",[],1781246118274]