[{"data":1,"prerenderedAt":54},["ShallowReactive",2],{"$faKMcyp0sWiPr1bB2ziQDmLiB0ARgMz7dekuNXPruRM8":3},{"id":4,"siteId":5,"orgId":5,"channelId":6,"userId":5,"modifiedUserId":5,"created":7,"modified":8,"publishDate":9,"sticky":10,"withImage":11,"inputType":10,"type":10,"status":10,"order":4,"site":12,"channel":15,"org":27,"user":31,"modifiedUser":33,"blockItemList":34,"tags":35,"destList":36,"views":37,"title":38,"text":39,"url":40,"description":41,"template":42,"normal":11,"link":43,"image":44,"alias":45,"ups":10,"downs":10,"downloads":10,"customs":46,"fileList":48,"subtitle":47,"editorType":49,"targetBlank":43,"dynamicUrl":40,"comments":10,"imageList":50,"baiduPush":43,"favorites":10,"dayViews":10,"weekViews":10,"monthViews":10,"quarterViews":10,"yearViews":37,"plainText":51,"fileSize":52,"blocks":53,"editable":11,"allowComment":11},"90993160002933761","1","90985281347328002","2026-04-01T17:54:39+08:00","2026-04-02T16:04:59+08:00","2025-05-15T17:53:21+08:00",0,true,{"id":5,"name":13,"url":14},"Auralink Energy CMS","https:\u002F\u002Fwww.auralink-energy.com\u002Fapi\u002F",{"id":6,"articleModelId":16,"name":17,"nav":11,"orderDesc":11,"url":18,"paths":19},"91034869741071362","英文","https:\u002F\u002Fwww.auralink-energy.com\u002Fapi\u002F\u002Fchannel\u002Fcase-studies_en",[20,25],{"id":21,"name":22,"alias":23,"nav":11,"url":24},"90985255056381954","案列研究","case-studies","https:\u002F\u002Fwww.auralink-energy.com\u002Fapi\u002F\u002Fchannel\u002Fcase-studies",{"id":6,"name":17,"alias":26,"nav":11,"url":18},"case-studies_en",{"id":5,"name":28,"paths":29},"总部",[30],{"id":5,"name":28},{"id":5,"username":32},"admin",{"id":5,"username":32},[],[],[],"0","Singapore – Jurong Industrial Area","\u003Cp>The Jurong Industrial Area is one of the earliest and largest industrial zones in Singapore, covering over \u003Cstrong>60 square kilometers\u003C\u002Fstrong>. It is home to industries such as petrochemicals, shipbuilding, engineering, manufacturing, and logistics.\u003C\u002Fp>\n\u003Cp>As Singapore accelerates its transition toward \u003Cstrong>digitalization, AI, and sustainable energy\u003C\u002Fstrong>, Jurong is evolving into a hub that integrates \u003Cstrong>advanced manufacturing and new energy solutions\u003C\u002Fstrong>.\u003C\u002Fp>\n\u003Cp>Due to the high density of enterprises within the park, demand for EV charging infrastructure continues to grow. As a \u003Cstrong>pilot project\u003C\u002Fstrong>, the initial phase focuses on \u003Cstrong>7kW AC chargers\u003C\u002Fstrong> to meet daily charging needs. Future expansion plans include the gradual deployment of \u003Cstrong>DC fast charging systems\u003C\u002Fstrong> in line with evolving demand.\u003C\u002Fp>","https:\u002F\u002Fwww.auralink-energy.com\u002Fapi\u002F\u002Farticle\u002FSingapore-Jurong-Industrial-Area","The Jurong Industrial Area is one of the earliest and largest industrial zones in Singapore, covering over 60 square kilometers. It is home to industries such as petrochemicals, shipbuilding, engineering, manufacturing, and logistics. As Singapore accelerates its transition toward digitalization, AI, and sustainable energy, Jurong is evolving into a hub that integrates advanced manufacturing and new energy solutions. Due to the high density of enterprises within the park, demand for EV charging infrastruc","\u002F1\u002Fdefault\u002Farticle",false,"\u002Fuploads\u002F1\u002Fimage\u002F2026\u002F04\u002F20260402095918068_ptx47taneb6c.jpg","Singapore-Jurong-Industrial-Area",{"projectName":47},"5 Units 7kW AC Chargers",[],1,[],"The Jurong Industrial Area is one of the earliest and largest industrial zones in Singapore, covering over 60 square kilometers. It is home to industries such as petrochemicals, shipbuilding, engineering, manufacturing, and logistics. As Singapore accelerates its transition toward digitalization, AI, and sustainable energy, Jurong is evolving into a hub that integrates advanced manufacturing and new energy solutions. Due to the high density of enterprises within the park, demand for EV charging infrastructure continues to grow. As a pilot project, the initial phase focuses on 7kW AC chargers to meet daily charging needs. Future expansion plans include the gradual deployment of DC fast charging systems in line with evolving demand.","0 KB",[],1781246118791]