[{"data":1,"prerenderedAt":54},["ShallowReactive",2],{"$f6fDvgFqgt5UgxVJMrpr9NzzcWczpyJw6RNAJ8af-LCY":3},{"id":4,"siteId":5,"orgId":5,"channelId":6,"userId":5,"modifiedUserId":5,"created":7,"modified":8,"publishDate":9,"sticky":10,"withImage":11,"inputType":10,"type":10,"status":10,"order":4,"site":12,"channel":15,"org":27,"user":31,"modifiedUser":33,"blockItemList":34,"tags":35,"destList":36,"views":37,"title":38,"text":39,"url":40,"description":41,"template":42,"normal":11,"link":43,"image":44,"alias":45,"ups":10,"downs":10,"downloads":10,"customs":46,"fileList":48,"subtitle":47,"editorType":49,"targetBlank":43,"dynamicUrl":40,"comments":10,"imageList":50,"baiduPush":43,"favorites":10,"dayViews":10,"weekViews":10,"monthViews":10,"quarterViews":10,"yearViews":37,"plainText":51,"fileSize":52,"blocks":53,"editable":11,"allowComment":11},"90993119452402690","1","90985281347328002","2026-04-01T17:53:22+08:00","2026-04-02T16:05:25+08:00","2025-10-15T17:52:02+08:00",0,true,{"id":5,"name":13,"url":14},"Auralink Energy CMS","https:\u002F\u002Fwww.auralink-energy.com\u002Fapi\u002F",{"id":6,"articleModelId":16,"name":17,"nav":11,"orderDesc":11,"url":18,"paths":19},"91034869741071362","英文","https:\u002F\u002Fwww.auralink-energy.com\u002Fapi\u002F\u002Fchannel\u002Fcase-studies_en",[20,25],{"id":21,"name":22,"alias":23,"nav":11,"url":24},"90985255056381954","案列研究","case-studies","https:\u002F\u002Fwww.auralink-energy.com\u002Fapi\u002F\u002Fchannel\u002Fcase-studies",{"id":6,"name":17,"alias":26,"nav":11,"url":18},"case-studies_en",{"id":5,"name":28,"paths":29},"总部",[30],{"id":5,"name":28},{"id":5,"username":32},"admin",{"id":5,"username":32},[],[],[],"0","Malaysia – Johor State","\u003Cp>Located at the southernmost tip of Malaysia, Johor State is a strategic gateway connecting Malaysia and Singapore.\u003C\u002Fp>\n\u003Cp>The station adopts a \u003Cstrong>full-matrix PDM (Power Distribution Module) system\u003C\u002Fstrong>, enabling \u003Cstrong>dynamic and flexible power allocation\u003C\u002Fstrong>. A single main unit can support up to \u003Cstrong>12 charging terminals\u003C\u002Fstrong> and is compatible with \u003Cstrong>liquid-cooled ultra-fast charging systems\u003C\u002Fstrong>, making it ideal for public charging stations, bus depots, and dedicated fleet operations.\u003C\u002Fp>\n\u003Cp>With a well-developed transportation network—including the North-South Expressway and direct links to Singapore via the Johor–Singapore Causeway and Second Link—the project effectively addresses \u003Cstrong>high-frequency, multi-vehicle charging demands\u003C\u002Fstrong> across the region.\u003C\u002Fp>","https:\u002F\u002Fwww.auralink-energy.com\u002Fapi\u002F\u002Farticle\u002FMalaysia-Johor-State","Located at the southernmost tip of Malaysia, Johor State is a strategic gateway connecting Malaysia and Singapore. The station adopts a full-matrix PDM (Power Distribution Module) system, enabling dynamic and flexible power allocation. A single main unit can support up to 12 charging terminals and is compatible with liquid-cooled ultra-fast charging systems, making it ideal for public charging stations, bus depots, and dedicated fleet operations. With a well-developed transportation network&mdash;includin","\u002F1\u002Fdefault\u002Farticle",false,"\u002Fuploads\u002F1\u002Fimage\u002F2026\u002F04\u002F20260402095926321_anii7tfm797f.jpg","Malaysia-Johor-State",{"projectName":47},"480kW Charging System (1-to-10) + 5 Units 7kW AC Chargers",[],1,[],"Located at the southernmost tip of Malaysia, Johor State is a strategic gateway connecting Malaysia and Singapore. The station adopts a full-matrix PDM (Power Distribution Module) system, enabling dynamic and flexible power allocation. A single main unit can support up to 12 charging terminals and is compatible with liquid-cooled ultra-fast charging systems, making it ideal for public charging stations, bus depots, and dedicated fleet operations. With a well-developed transportation network&mdash;including the North-South Expressway and direct links to Singapore via the Johor&ndash;Singapore Causeway and Second Link&mdash;the project effectively addresses high-frequency, multi-vehicle charging demands across the region.","0 KB",[],1781246118806]